CUMMINS Home Standby Generator Set Instrukcja Instalacji Strona 1

Przeglądaj online lub pobierz Instrukcja Instalacji dla Generatory prądu CUMMINS Home Standby Generator Set. CUMMINS Home Standby Generator Set Installation manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 0
Installation Manual
Home Standby Generator Set
GSBB (Spec A)
English - Original Instructions 4-2010 A029V088 (Issue 2)
Przeglądanie stron 0
1 2 3 4 5 6 ... 99 100

Podsumowanie treści

Strona 1 - Installation Manual

Installation ManualHome Standby Generator SetGSBB (Spec A)English - Original Instructions 4-2010 A029V088 (Issue 2)

Strona 2

2. Introduction 4-201060 Hz 50 HzPropane Vapor Natural Gas Propane Vapor Natural GasOperating Temperature RangeBelow 20 °F (-7 °C) Additional oil heat

Strona 3 - Table of Contents

Cummins Power Generation1400 73rd Ave. NEMinneapolis, MN 55432 USAPhone 1 763 574 5000Toll-free 1 800 888 6626Fax 1 763 574 5298Copyright © 2010 Cummi

Strona 4 - Table of Contents 4-2010

4-2010 2. Introduction60 Hz 50 HzPropane Vapor Natural Gas Propane Vapor Natural GasOil Capacity Approximately 80 oz (2.3 Liters)Oil Recommendation 0W

Strona 5 - 1.2 General Precautions

2. Introduction 4-20102.3 Information For After InstallationWARNING: Improper installation can result in severe personal injury, death and damageto eq

Strona 6 - 1.6 Batteries Can Explode

3 Step-By-Step Outline of InstallationWARNING: The installer is responsible for complying with all applicable installationcodes and safety requirement

Strona 7 - A029V088 (Issue 2) 3

3. Step-By-Step Outline of Installation 4-20103.1.1 Installation Codes and Standards for SafetyWARNING: The generator set installer bears sole respons

Strona 8 - 4 A029V088 (Issue 2)

4-2010 3. Step-By-Step Outline of InstallationAppropriately-sized junction box and cover for heater/GFCI wiring (if installing). XProvided on cold wea

Strona 9 - 2 Introduction

3. Step-By-Step Outline of Installation 4-20103.1.2.2 Tools RequiredUse a forklift to move the generator set and set it in place. Alternatively, a one

Strona 10 - 6 A029V088 (Issue 2)

4-2010 3. Step-By-Step Outline of InstallationRSS 200-6869 XNOTE: Model RSS 100-6634 and RSS 200-6635 transfer switches do not incorporatea utility ci

Strona 11 - A029V088 (Issue 2) 7

3. Step-By-Step Outline of Installation 4-2010FIGURE 3. PARTIAL COVERAGE LOAD CONNECTIONS (TRANSFER SWITCH WITH CONTROLLER)FIGURE 4. FULL COVERAGE LOA

Strona 12 - 8 A029V088 (Issue 2)

4-2010 3. Step-By-Step Outline of InstallationGenerator set location is critical for safety and good performance. Follow the guidelines below:· Instal

Strona 14 - 3.1.2.1 Materials Required

3. Step-By-Step Outline of Installation 4-2010FIGURE 5. GENERATOR SET CLEARANCES3.3 Preparing the SiteSteps to preparing a proper/safe generator set s

Strona 15 - A029V088 (Issue 2) 11

4-2010 3. Step-By-Step Outline of InstallationSet the generator set in place and pound the four corner stakes into the ground to secure thegenerator s

Strona 16 - 3.1.2.2 Tools Required

3. Step-By-Step Outline of Installation 4-20103.6.1 AC Power Supply ConnectionsWARNING: Electrical connections must be made by a licensed electrician.

Strona 17 - A029V088 (Issue 2) 13

4-2010 3. Step-By-Step Outline of InstallationFIGURE 7. TYPICAL SYSTEM GROUNDING ONE-LINE DIAGRAMS3.6.3 Automatic Transfer SwitchThe model GSBB genera

Strona 18 - 14 A029V088 (Issue 2)

3. Step-By-Step Outline of Installation 4-20103.6.3.1 Transfer Switch Communications WiresWARNING: Interconnecting the generator set and the public ut

Strona 19 - A029V088 (Issue 2) 15

4-2010 3. Step-By-Step Outline of Installation3. Mount the operator panel with four No. 6 wood screws or wall anchors.· On brick, stone or block walls

Strona 20 - 3.3 Preparing the Site

3. Step-By-Step Outline of Installation 4-2010No. Description No. Description1 NC 2 Load control pin 8 or 93 Ground pin 4 4 From thermostat5 To air co

Strona 21 - A029V088 (Issue 2) 17

4-2010 3. Step-By-Step Outline of InstallationNo. Description No. Description1 NC 2 Load Control Pin 8 or 93 Ground Pin 4 4 From Circuit Breaker5 To L

Strona 22 - 3.6.2 Grounding

3. Step-By-Step Outline of Installation 4-2010No. Description No. Description1 NC 2 Load Control Pin 8 or 93 Ground Pin 4 4 From Circuit Breaker5 To L

Strona 23 - A029V088 (Issue 2) 19

4-2010 3. Step-By-Step Outline of InstallationAn optional thermostatically controlled battery heater is available for more reliable starting inambient

Strona 24 - 3.6.5 Operator Panel

Table of Contents1. IMPORTANT SAFETY INSTRUCTIONS ... 11.1 Save The

Strona 25 - A029V088 (Issue 2) 21

3. Step-By-Step Outline of Installation 4-2010In all fuel system installations, cleanliness is extremely important.· Make every effort to prevent fuel

Strona 26 - · Mounting: No restrictions

4-2010 3. Step-By-Step Outline of InstallationCallout ComponentNumber12 Fuel Connection (Female) 3/4 NPT & NG & LPV13 4x Anchoring SpikeFIGURE

Strona 27

3. Step-By-Step Outline of Installation 4-2010See the Generator Set Specifications Table for fuel specifications, such as BTU. Todetermine the require

Strona 28 - 3.6.8 Battery

4-2010 3. Step-By-Step Outline of InstallationTABLE 20. NATURAL GAS PIPE CAPACITY - CUBIC FEET OF GAS PER HOURNormal Iron Length of Pipe in FeetPipe S

Strona 29 - 3.7 Fuel System

3. Step-By-Step Outline of Installation 4-2010TABLE 21. REQUIRED PROPANE TANK SIZE IN GALLONS (LITERS) FOR INDICATEDTEMPERATURES WHEN KEPT AT LEAST HA

Strona 30 - 3.7.1 Fuel Line Connections

4-2010 3. Step-By-Step Outline of InstallationTABLE 22. PROPANE VAPOR PIPE CAPACITY - CUBIC FEET OF GAS PER HOURNominal Iron Length of Pipe in FeetPip

Strona 31 - 3.7.3 Natural Gas Fuel System

3. Step-By-Step Outline of Installation 4-2010After assembly, and before initial operation, all fuel system connections, hose valves, regulatorsand fi

Strona 32 - 28 A029V088 (Issue 2)

4 Optional Internet/Email InterfaceDescriptions4.1 IntroductionThis feature allows for in-home or remote access to your generator set through a web pa

Strona 33 - 3.7.4 Propane Fuel System

4. Optional Internet/Email Interface Descriptions 4-20104.2 Screen DescriptionsFIGURE 15. HOME PAGE4.2.1 Setting Time and DateSelect the Genset Time/D

Strona 34 - 30 A029V088 (Issue 2)

4-2010 4. Optional Internet/Email Interface Descriptions4.2.2 Set Exercise ScheduleSelect the Exercise Schedule Tab on the Home Screen to set the gene

Strona 35 - A029V088 (Issue 2) 31

Table of Contents 4-20106.2 In-Home Network Access to the Generator Set ... 426.3 Setti

Strona 36 - 3.8 Engine Exhaust

4. Optional Internet/Email Interface Descriptions 4-2010FIGURE 19. EVENT LOG4.2.5 Fault LogSelect the Fault Log Tab on the Home Screen to review the l

Strona 37 - Descriptions

4-2010 4. Optional Internet/Email Interface DescriptionsFIGURE 22. NETWORK SETUP PARAMETERS4.2.7 Email Setup Screen DescriptionsThe user must determin

Strona 38 - 4.2 Screen Descriptions

4. Optional Internet/Email Interface Descriptions 4-2010FIGURE 25. SAVE SCREEN38 A029V088 (Issue 2)

Strona 39 - 4.2.4 Event Log

5 Ethernet Connection InstallationWorksheet:NOTE: IMPORTANT: Leave a filled-out copy of this sheet (chapter) with the customerfor future reference.Thi

Strona 40 - 4.2.5 Fault Log

5. Ethernet Connection Installation Worksheet: 4-20105.3.2 Email/Internet Service Provider (ISP)DSL, Cable, Satellite, etc.This will support Email Not

Strona 41 - 4.2.8 Saving Changes

6 Optional Internet/Email Interface Setup6.1 Ethernet Connections (Optional)Wiring connections to the Ethernet RJ-45 plug are shown in the Ethernet RJ

Strona 42 - FIGURE 25. SAVE SCREEN

6. Optional Internet/Email Interface Setup 4-2010FIGURE 28. NETWORK CONNECTIONS6.2 In-Home Network Access to the Generator Set1. Connect an Ethernet c

Strona 43 - Worksheet:

4-2010 6. Optional Internet/Email Interface SetupPassword: CumminsThe following screen will be displayed after a few seconds.NOTE: It may take a few s

Strona 44 - 40 A029V088 (Issue 2)

6. Optional Internet/Email Interface Setup 4-2010FIGURE 30. NETWORK SETUP SCREEN ON THE IN-HOME OPERATOR PANELFIGURE 31. NETWORK SETUP SCREENFIGURE 32

Strona 45 - FIGURE 26. ETHERNET CONNECTOR

4-2010 6. Optional Internet/Email Interface Setup3. Click Click here to start Network Setup.4. Set up in-home computer access to the generator set.5.

Strona 46 - 42 A029V088 (Issue 2)

1 IMPORTANT SAFETY INSTRUCTIONS1.1 Save These InstructionsThis manual contains important instructions for the generator set that should be followed du

Strona 47 - FIGURE 29. GENERATOR SET HOME

6. Optional Internet/Email Interface Setup 4-2010FIGURE 34. NETWORK SETUP SCREENFIGURE 35. NETWORK SETUP PARAMETERSFIGURE 36. EMAIL SETUP PARAMETERSFI

Strona 48 - 44 A029V088 (Issue 2)

4-2010 6. Optional Internet/Email Interface Setup6.5 Remote Internet Access to the Generator SetWARNING: Opening ports in your firewall can pose netwo

Strona 49 - 6.4 Email Setup Parameters

6. Optional Internet/Email Interface Setup 4-2010Answer: Yes, a router or switch is required to allow for the connection of more than one device(compu

Strona 50 - FIGURE 37. EMAIL ADDRESSES

4-2010 6. Optional Internet/Email Interface SetupAnswer: Static IP addresses are required if you plan to access your generator set remotely viathe Int

Strona 51 - 6.6 Help Hotline

6. Optional Internet/Email Interface Setup 4-2010This page is intentionally blank.50 A029V088 (Issue 2)

Strona 52 - 48 A029V088 (Issue 2)

7 Operation7.1 3 Position SwitchA three-position Start/Stop switch is located at the genset control panel.Switch positions available:· Manual Start: N

Strona 53 - A029V088 (Issue 2) 49

7. Operation 4-20107.2 In-Home Operator PanelThe operator panel must be hard-wired to the generator set in order for the generator system tooperate.NO

Strona 54 - 50 A029V088 (Issue 2)

4-2010 7. Operation7.3 Typical OperationNOTE: The following diagrams are based on an APPROXIMATE time duration. Yourgenset may vary slightly from the

Strona 55 - 7 Operation

7. Operation 4-2010FIGURE 42. EXERCISE TIMING DIAGRAM54 A029V088 (Issue 2)

Strona 56 - 7.2 In-Home Operator Panel

4-2010 7. OperationFIGURE 43. MANUAL START/STOP TIMING DIAGRAMA029V088 (Issue 2) 55

Strona 57 - 7.3 Typical Operation

1. IMPORTANT SAFETY INSTRUCTIONS 4-2010· This standby generator set and the public utility may only be connected to the housecircuits by means of the

Strona 58 - 54 A029V088 (Issue 2)

7. Operation 4-2010FIGURE 44. LOAD MANAGEMENT TIMING DIAGRAM7.3.1 Normal Operation: Utility Power Available and ConnectedAs long as utility power is a

Strona 59 - A029V088 (Issue 2) 55

4-2010 7. OperationFIGURE 45. UTILITY PRESENT AND CONNECTED—STANDBY OFF LAMP ON7.3.2 Emergency Operation: Utility Power InterruptedIf utility power is

Strona 60 - 56 A029V088 (Issue 2)

7. Operation 4-20107.4 To Enable/Disable StandbyNormally, you should not have to disable generator set STANDBY.· STANDBY should always be enabled (ON)

Strona 61 - A029V088 (Issue 2) 57

4-2010 7. Operation2. Press START to manually start the generator set and connect it to supply power to thehouse. The STANDBY OFF lamp will come on an

Strona 62 - 7.4 To Enable/Disable Standby

7. Operation 4-2010· Perform the maintenance.Press the BACK button to return to the home screen.FIGURE 50. TYPICAL MAINTENANCE DUE SCREEN7.6.3 New Eve

Strona 63 - 7.6.2 Maintenance Due Screen

4-2010 7. OperationFIGURE 52. GENERATOR SET STATUS SCREEN7.8 Display Setup and Software Info7.8.1 Brightness and ContrastTo change the Brightness and

Strona 64 - 7.7 Genset Status

7. Operation 4-2010FIGURE 53. DISPLAY SETUP AND SOFTWARE INFO SCREENS7.8.2 Software InfoTo check on the generator set and display software:1. Press th

Strona 65 - 7.8.1 Brightness and Contrast

4-2010 7. Operation5. Press the BACK button to return to the home screen.7.9 Event Log7.9.1 To Check Log of Last 20 Events1. Press the MENU button on

Strona 66 - 7.8.2 Software Info

7. Operation 4-2010· "Genset exercise completed"· "Genset started due to loss of utility"· "Genset stopped with return of uti

Strona 67 - 7.9 Event Log

4-2010 7. OperationFIGURE 55. FAULT LOG SCREEN7.11 Exercise SettingsTo set the generator set exercise schedule:1. Press the EXCER button on the home s

Strona 68 - 7.10 Fault Log

4-2010 1. IMPORTANT SAFETY INSTRUCTIONS· To prevent arcing when disconnecting the battery:· Move the Stop Switch (S2) to the Stop position, disconnect

Strona 69 - 7.11 Exercise Settings

7. Operation 4-2010WeeklyBimonthlyMonthlyNever4. Press the BACK button to save the settings and return to the home screen.5. If you want to exercise t

Strona 70 - 7.12 Time Setup

4-2010 7. OperationFIGURE 57. TIME SETUP SCREEN7.13 Load ManagementThe generator set may have been set up at installation to connect and disconnect ce

Strona 71 - 7.13 Load Management

7. Operation 4-20107.13.2 Manual Load ManagementCAUTION: To reduce unnecessary loss of service, it is highly recommended that manual loadmanagement be

Strona 72 - 7.13.2 Manual Load Management

8 Startup and Configuration8.1 Installation ReviewBefore starting the genset inspect the installation and check off each of the following questions if

Strona 73 - 8 Startup and Configuration

8. Startup and Configuration 4-2010If the situation occurs, close the main valve at the tank and vent the fuel from the line at thetank. After reconne

Strona 74 - 70 A029V088 (Issue 2)

4-2010 8. Startup and ConfigurationFIGURE 59. GENERATOR CONFIGURATION8.5 Transfer Switch ConfigurationTo configure the generator set for the transfer

Strona 75 - A029V088 (Issue 2) 71

8. Startup and Configuration 4-20102. Press and hold the blank button on the menu screen for at least 5 seconds to go to theConfig Menu.3. Press the u

Strona 76 - 72 A029V088 (Issue 2)

4-2010 8. Startup and ConfigurationFIGURE 60. TRANSFER SWITCH CONFIGURATION8.6 Transfer Switch Parameter AdjustmentsModel RSS100-6634 and RSS200-6635

Strona 77 - A029V088 (Issue 2) 73

8. Startup and Configuration 4-2010Model RSS100-6868 and RSS200-6869 Transfer Switches: To make transfer switchparameter adjustments:1. Press the MENU

Strona 78 - 74 A029V088 (Issue 2)

4-2010 8. Startup and ConfigurationFIGURE 61. TRANSFER SWITCH ADJUSTMENTS8.7 Generator Adjustments8.7.1 To Adjust the Output VoltageUse the following

Strona 79 - 8.7 Generator Adjustments

1. IMPORTANT SAFETY INSTRUCTIONS 4-20101.8.3 Only You Can Protect Yourself From CO Poisoning!· Locate the generator in an area where there are no wind

Strona 80 - 76 A029V088 (Issue 2)

8. Startup and Configuration 4-20102. With Output Volts selected on the Adjustments Menu screen, press the up or down arrowbutton to adjust the voltag

Strona 81 - Troubleshooting

9 Communication Troubleshooting9.1 In-Home Network Access to Generator SetTroubleshootingWARNING: Some Generator Set service procedures present hazard

Strona 82

9. Communication Troubleshooting 4-2010FIGURE 63. NETWORK CONNECTIONS (CONTROL BOARD AND ETHERNET CONNECTION)9.2 Remote Internet Access to Generator S

Strona 83 - A029V088 (Issue 2) 79

4-2010 9. Communication Troubleshooting7. Check to see if you can access a standard web page from a computer.· If not, contact the ISP to troubleshoot

Strona 84 - 80 A029V088 (Issue 2)

9. Communication Troubleshooting 4-20108. Verify with your ISP that the Static DNS (Domain Name Server) #1 and #2 are correct.9. If the previous steps

Strona 85 - A029V088 (Issue 2) 81

4-2010 9. Communication TroubleshootingFIGURE 65. GENERATOR SET HOME PAGEFIGURE 66. NETWORK SETUP - PAGE 2A029V088 (Issue 2) 81

Strona 86 - 82 A029V088 (Issue 2)

9. Communication Troubleshooting 4-2010FIGURE 67. NETWORK SETUP - PAGE 382 A029V088 (Issue 2)

Strona 87

Appendix A. Outline and System DrawingsTable of ContentsFigure 68. Wiring Diagram (Sheet 1 of 3) ...

Strona 88 - 84 A029V088 (Issue 2)

Appendix A. Outline and System Drawings 4-2010This page is intentionally blank.84 A029V088 (Issue 2)

Strona 89 - A029V088 (Issue 2) 85

4-2010 Appendix A. Outline and System DrawingsFIGURE 68. WIRING DIAGRAM (SHEET 1 OF 3)A029V088 (Issue 2) 85

Strona 90 - 86 A029V088 (Issue 2)

2 IntroductionImportant note for Brazil applications: The manufacturer warns that the installation, operationand maintenance of equipment by the user

Strona 91 - A029V088 (Issue 2) 87

Appendix A. Outline and System Drawings 4-2010FIGURE 69. WIRING DIAGRAM (SHEET 2 OF 3)86 A029V088 (Issue 2)

Strona 92 - FIGURE 71. HARNESS LABEL

4-2010 Appendix A. Outline and System DrawingsFIGURE 70. WIRING DIAGRAM (SHEET 3 OF 3)A029V088 (Issue 2) 87

Strona 93 - A029V088 (Issue 2) 89

Appendix A. Outline and System Drawings 4-2010FIGURE 71. HARNESS LABEL88 A029V088 (Issue 2)

Strona 94 - 90 A029V088 (Issue 2)

4-2010 Appendix A. Outline and System DrawingsFIGURE 72. HARNESS CONNECTIONS (SHEET 1 OF 4)A029V088 (Issue 2) 89

Strona 95 - A029V088 (Issue 2) 91

Appendix A. Outline and System Drawings 4-2010FIGURE 73. HARNESS CONNECTIONS (SHEET 2 OF 4)90 A029V088 (Issue 2)

Strona 96 - 92 A029V088 (Issue 2)

4-2010 Appendix A. Outline and System DrawingsFIGURE 74. WIRING HARNESS CONNECTIONS (SHEET 3 OF 4)A029V088 (Issue 2) 91

Strona 97 - FIGURE 76. OUTLINE DRAWING

Appendix A. Outline and System Drawings 4-2010FIGURE 75. WIRING HARNESS CONNECTIONS (SHEET 4 OF 4)92 A029V088 (Issue 2)

Strona 98 - 94 A029V088 (Issue 2)

4-2010 Appendix A. Outline and System DrawingsFIGURE 76. OUTLINE DRAWINGA029V088 (Issue 2) 93

Strona 99

Appendix A. Outline and System Drawings 4-2010This page is intentionally blank.94 A029V088 (Issue 2)

Komentarze do niniejszej Instrukcji

Brak uwag